This is a control system that manages a process defined by a series of tasks to be performed i.e. a sequence of operations, one after the other. Each operation in the sequence is performed either for a certain period of time (in which case, it is time-driven), or until the task is finished e.g. as indicated by a limit switch (in which case it is event-driven).
A time-driven sequence is open loop because there is no feedback while an event-driven task is closed loop because feedback signal is required to specify when the task is finished.
A typical example of a sequentially controlled system is the automatic washing machine. The first event in the wash cycle is to fill the tub with water. This is an event-driven task because the water is admitted till it gets to the proper level as indicated by a float and limit switch (i.e. a closed loop). The next two tasks, wash and spin drain, are each done for a specified period of time and are time-driven events i.e. open loop.
You can also read: What is Motion Control?
Silicon Controlled Rectifiers (SCRs), Triacs and other solid-state devices used for switching larger voltages and…
Almost all electronic devices and circuits need a dc source of power for their operation.…
Process Flow Diagrams (PFDs) defines the major elements of the process schematically i.e. the interconnections…
There are various technologies that are available that help plant automation personnel to obtain diagnostic…
An often utilized technique of indirectly measuring a liquid level is to measure the hydrostatic…
The megohmmeter or megger is a portable deflection instrument widely used to check the insulation…